論文(審査付き)

Field Survey in Indonesia 2008

SUMMARY REPORT OF FIELD SURVEY IN INDONESIA (December 25th to  2008 to January 9th 2009)

 

 

NO

DATE

ACTIVITY

PICTURE

1

DEC 25, 2008

Trip from Juanda Airport Surabaya to Malang City

Pic. Of Natural Disaster – Sidoarjo Mud Flow since May, 2006

 

Field Observation to Candi Sumberawan Spring in Toyomarto village

Pic. Of Water pond from the spring uses by PDAM, National Army & Air force, BLK Industry Singosari

Pic. Of Women`s Public Bathroom

Public Bathroom – villagers still use public bathroom in the river, that water comes from the spring

 

 

 

Evening  Informal Meeting with a group of the Head of Community in Candirenggo Village

Mainly drinking water is supplied by PDAM;

250 questionnaires were distributed to 250 households in three sub-villages

Night Meeting informal meeting with the Head of Sumberawan Sub-villages

Most of drinking water in Sumberawan sub-village is supplied by Hipam

250 questionnaires were distributed to 250 households in three sub-villages

2

Dec 26, 2008

2 Hours Morning Lecture from A/P Matsushima in front of around 100 students and 10 lecturers at Regional & Urban Planning Department, Engineering Faculty, University of Brawijaya

 

 

 

Pic. Of A/P Matsushima and Dr. Hayeong with some of lecturers in Regional and Urban Planning Department


No. 3 from right is Tri Budi Prayogo - Vice Dean for Student Affairs of Engineering Faculty


No. 4 from left is Dr. Surjono – Head of Regional & Urban Planning Department

Lunch Meeting with  2 staffs of Bappeda (Local Planning & Development Agent) and 2 staff of PDAM (Local Water Entreprise Company) of Malang Regency

Ir. Dwi – Head of Infrastructure & Regional Development Board of Bappeda

Ir. Harris – Head of Planning & Finance Division of PDAM

Evening Meeting In ESP-USAID Office

Ir. Agus Hernadi – Water and Sanitation Technical Specialist

Ir. Wahyu – Watershed Management Specialist

3

Dec 27, 2008

Field Observation to Sumberawan Village on the way back to Surabaya

Picture with Part of Surveyor Team and The Head of Sumberawan Sub-village

Total number of surveyor is 20 students, plus 1 student as a coordinator

Formally, they conducted interview survey within 7 days

Meeting in the office of the Head of Civil & Planning Faculty at ITS Surabaya

Prof. Joni Hermana – Head of Civil Engineering & Planning Faculty of ITS;

Dr. Eddy Soedjono – Head of Centre for Regional Development, Institute of Research & Public Services, ITS

Both of them will joint on March Workshop

4

Dec 28, 2008

Visited Institut Teknologi Bandung (ITB)

It will be the venue for The First Workshop on Water Supply Management System and Social Capital, on March 20th, 2009

 

 

 

Dinner Meeting at Braga Permai Restaurant in Bandung City

Meeting with Prof. Dr. B. Kombaitan – Vice President for Secretary and Communication Affairs of ITB, and Dr. Ibnu Syabri – Head of Research Center for Environment, Regional
Development and Infrastructure ITB

They are now preparing for One Day Workshop on March 20, 2009.

5

Dec 29, 2008

Visited Tangkuban Parahu – most famous volcano tourism object, 25 km north of Bandung city direction to Lembang district, Bandung Regency. The scenery is very beautiful, but the traffic congestion was so bad and it took almost 2 hours to reach the destination place from Bandung city.

 

最終更新日 2013年2月22日(金曜)13:51